astana-view

Register of social problems

Region Description of the problem Solutions Organization contacts
25.10.2017 458 Kyzylorda region
Г.Кызылорда, ул.Жандосова, 25/4
восстановление дома после пожара Необходимо финансирование 8 707 462 9387 Respond
25.10.2017 457 Kyzylorda region
city of Kyzylorda. st. A.Bokeikhan, 62
Overhaul of a multi-storey building Funding is required Absultanov Kairat Baigabylovich 8(7242)27-40-32 Respond
25.10.2017 456 Kyzylorda region
Aul District Karaultobe
Repair of access roads It is necessary to develop feasibility studies and design estimates. Rakhmatullaev Elmurat Nurmakhanbetovich 8(7242)21 33 21 Respond
25.10.2017 455 Kyzylorda region
Aul District of Kosshynyrau
Repair of access roads  It is necessary to develop feasibility studies and design estimates. Kushenbaeva Uldash Begalievna  8(7242)21 30 38 Respond
25.10.2017 454 Kyzylorda region
Zhanakorgan district
Overhaul of the Kelintobe-Koktobe highway  It is necessary to develop feasibility studies and design estimates.  Seylov Esdaulet Myrzadauletovich +7 (72435) 22-0-74 Respond
25.10.2017 453 Kyzylorda region
Aul District of Tan, settlement of Zhanakonos
Reconstruction of water supply networks It is necessary to develop feasibility studies and design estimates.  Beynakhatov Alibi Kodarovich +7 (72431) 37-1-63 Respond
25.10.2017 452 Kyzylorda region
Aul district named after M. Shamenov of the Zhalagash district
Construction of a school It is necessary to develop feasibility studies and design estimates. Suleimenov Gani Kenzhegarayevich +7 (72431) 37-3-96 Respond
25.10.2017 451 Kyzylorda region
Kent Shieli of the Shieli district
Reconstruction of obsolete and construction of new sewer networks It is necessary 23 million tenge for development of design estimates. Further funds are needed for construction Amanzholov Gabit Seyilbekuly +7 (72432)4-23-86 Respond
25.10.2017 450 Kyzylorda region
Aul Tartu District of the Shieli District
Construction of a house of culture A total of 2.0 million tenge was allocated for the development of the design estimates. Further funds are needed for construction Syindyk Dosmat Isakhauly  +7 (72432)28-1-02 Respond
25.10.2017 449 Kyzylorda region
Aul Gigant district of Shieli district
The problem of providing drinking water It is necessary 1.5 million tenge for development of design estimates. Further, funds are needed for the construction of a water pipe. Akhmetov Yerzhanbek Syidndukuly  +7 (72432)36-1-01 Respond

Partners